Strathmore building permit fees and suite rules in 2026

As of October 2026, Strathmore charges $10.75 per $1,000 of project value for a building permit, and its decks, sheds and suites need a development permit too.

Owner, 1to1 Plans Calgary

Updated · 7 min read

As of October 2026, the Town of Strathmore charges $10.75 for every $1,000 of project value for a residential building permit, with a $155 minimum plus a 4% Safety Codes levy (Town of Strathmore, 2026 Fees Bylaw No. 25-23). Project value means the real cost of materials and labour. Park Enterprises reviews and issues the permits for the Town, and decks, sheds, garages and suites need a development permit as well.

Key takeaways

Which projects need a permit in Strathmore?

Strathmore asks for a development permit on decks, sheds and garages, not only on suites and houses. Here's the Town's list, as of October 2026:

ProjectBuilding permitDevelopment permit as well
New houseYes, plus utility permitsYes
Basement developmentYes, plus utility permits for heating, wiring or plumbingNo, unless it becomes a suite
Secondary suiteYes, plus utility permitsYes
DeckOver 0.6 m (2 ft) above grade, or attached to a mobile homeYes, for the same decks
Shed or garage10 m² (107 sq ft) or largerYes, for the same sizes
Pool or hot tubYesYes
FenceUnder 2.0 m (6 ft 7 in), noOnly for a height variance

Note: From the Town's residential applications page. The Town says it usually doesn't need a development permit for internal renovations.

For how Calgary handles the same projects, see the Calgary building permit guide.

What does a building permit cost in Strathmore in 2026?

Value sets the building permit, and size sets nothing. These are the 2026 rates from Schedule E of the Fees Bylaw:

Item2026 fee
Building permit, residential$10.75 per $1,000 of project value
Minimum building permit$155, plus the levy
Safety Codes levy on a building permit4%, $5.00 minimum, $560 maximum
Development permit, new single detached or semi-detached house$375 per dwelling unit
Development permit, secondary suite$300 per dwelling unit
Development permit, addition$230 plus $0.50 per m²
Development permit, accessory building over 10.0 m² in a residential district$170 per building
Water infrastructure oversize charge, residential$585 per dwelling unit, due with the development permit
Building permit extension$165

Note: Read from the page images of the scanned 2026 Fees Bylaw No. 25-23, in force since 1 January 2026, PDF pages 9 and 12. Ask whether the oversize charge applies to a suite.

The bylaw says "Verification of costs may be requested" before a permit is issued, so price the work accurately. Gas, plumbing and electrical permits are separate and are priced by outlets or by installation cost. For a home, a plumbing permit for 1 to 3 outlets and a gas permit for 1 or 2 outlets are $150 each.

The Town's fee page is out of date. Its Planning and Development Fees page still says its fee schedules "are current as of November 15, 2023" (Town of Strathmore, planning and development fees). This guide uses the 2026 bylaw.

How do Strathmore's fees compare with Calgary's?

Strathmore is cheaper for a small deck and dearer for nearly everything else, because value-based fees climb fast. Calgary charges flat fees for these projects. Here's the same work under each 2026 schedule:

ProjectStrathmore, building permit with levyStrathmore development permitCalgary, levy included
Deck valued at $15,000$167.70Fee not itemized$205.92
Detached garage valued at $50,000$559.00$170$333.84
Basement development valued at $40,000$447.20None$333.84
Basement suite valued at $60,000$670.80$300$403.52
Two-storey house valued at $323,000$3,611.14, trades extra$375, plus $585 oversize charge$3,522.71, trades included

Note: From Strathmore's Fees Bylaw and Calgary's 2026 schedule. Calgary's house fee is $112 plus $10.14 per $1,000, plus levy.

The $323,000 house isn't invented. It's the average value declared on Strathmore's two-storey house permits from January to July 2026, worked out in the table further down.

What are the rules for suites in Strathmore?

One suite, inside the house. Strathmore's Land Use Bylaw 14-11 defines a secondary suite as a self-contained unit "located within a Dwelling Unit" (Town of Strathmore, Land Use Bylaw, definition 158).

Detached suites had a short life. Bylaw 24-14, passed on 3 July 2024, added garden and garage suites as discretionary uses. Bylaw 25-09, passed on 4 June 2025, removed them, and the consolidation updated 2 October 2025 shows both struck from the R1 district's uses. Calgary still allows backyard suites; the backyard suite guide covers them.

Here are the rules that apply now:

RuleStrathmore Land Use Bylaw 14-11
Suites per house1 (section 3.34.1)
ParkingAt least 1 on-site stall for the suite, on top of the house's (3.34.2)
Tandem parkingSupported by the Development Authority (3.34.3)
Street parkingDoesn't count toward the suite's stall (3.34.4)
Status in R1Discretionary use
R1 minimum site457.0 m² (4,919 sq ft) per dwelling and 15.0 m (49 ft 3 in) wide

Note: From the office consolidation updated 2 October 2025. A few sites carry their own direct control suite rules.

Discretionary means the Development Authority decides each suite on its merits rather than approving it as of right. The Town also notes that "A basement development is not necessarily a secondary suite". For the code side of a basement suite, see the legal basement suite guide.

How long does a permit take in Strathmore?

Strathmore doesn't publish a timeline for building or development permits. What it does say affects scheduling: the building inspector is in town two days a week, and the Town asks you to "take this change into consideration" when you apply (Town of Strathmore, safety code permits and inspections).

A new house adds one more step. Before you connect to the Town's water, sanitary and storm sewers, you must call the Town three days ahead, and photos of the connection go to serviceconnect@strathmore.ca before you backfill.

A basement suite in Strathmore, in orderConfirm the suite's on-site parking stall, then Email the development permit application ($300), then Discretionary decision and appeal period, then Email the building permit and gas, plumbing and electrical applications, then Park Enterprises reviews and issues, then Inspections on the inspector's two days a week. All applications go to development@strathmore.ca.Confirm thesuite's on-siteparking stallEmail thedevelopment permitapplication ($300)Discretionarydecision andappeal periodEmail the buildingpermit and gas,plumbing andPark Enterprisesreviews and issuesInspections on theinspector's twodays a weekAll applications go to development@strathmore.ca.
A basement suite in Strathmore, in order

How much does Strathmore build each year?

Strathmore publishes a monthly building report. The July 2026 report shows, for January to July:

Permit typeJan to Jul 2026Average declared valueJan to Jul 2025
Two-storey houses31$322,99520
Bungalows6$347,6205
Accessory buildings9$39,4449
Residential renovations and additions53$19,59092

Note: Totals divided by permits, from the July 2026 monthly building report. The Town notes the values are estimates on issued permits, not construction starts.

New houses are up and renovations are down by more than 40%. The Town also runs a Planning Applications Dashboard covering every planning application since 1 January 2025.

How do you apply for a permit in Strathmore?

By email. There's no permit portal: you fill in the Town's fillable forms and send them to development@strathmore.ca, for development, building and utility permits alike (Town of Strathmore, safety code permits and inspections). Utility permit fees depend on the job's value or its number of fixtures, so fill in that section of each form.

Each common project has its own package on the residential page: basement, secondary suite, uncovered or covered deck, shed, detached garage, pool and hot tub. A pool or hot tub on a deck needs engineered drawings.

Where does a full-size walkthrough fit?

Before the suite's development permit, and before you price the job. In Strathmore the permit fee follows the project value, and the suite has to fit inside walls you already own, with no garden suite to fall back on.

The 1to1 Plans Calgary studio is in northeast Calgary, on the Strathmore side of the city, and lights your plan at full size from inside a walkable LED floor. You walk the suite's rooms with their names and dimensions on the floor, try freestanding walls and furniture, and see each change straight away. The two-hour session is recorded.

Sessions are quoted per plan, and the quote is free; pricing shows how quotes work. Book a session. The room sizes guides list code minimums. Comparing towns? Read the Airdrie guide or, for an acreage, the Rocky View County guide.

Questions

Who issues building permits in Strathmore?

In Strathmore, Park Enterprises reviews and issues building, gas, plumbing and electrical permits for the Town, as of October 2026 (Town of Strathmore, planning applications and fees). You still apply to the Town, by email to development@strathmore.ca.

Can I build a garden suite or garage suite in Strathmore?

No. Strathmore removed garden and garage suites from its Land Use Bylaw with Bylaw 25-09 on 4 June 2025, less than a year after adding them (Town of Strathmore, Land Use Bylaw). As of October 2026, only a secondary suite inside the house is allowed, one per house.

Do I need a permit for a deck in Strathmore?

Yes, if it's more than 0.6 m (2 ft) above grade or attached to a mobile home. In Strathmore that deck needs both a development permit and a building permit, as of October 2026 (Town of Strathmore, residential applications). The building permit is $10.75 per $1,000 of value, $155 minimum, plus levy.

How much is a building permit for a new house in Strathmore?

A new house in Strathmore pays $10.75 per $1,000 of project value for its building permit in 2026, plus a 4% levy capped at $560. A house valued at $400,000 pays $4,472. The development permit adds $375, and a $585 water infrastructure oversize charge is due with it (Town of Strathmore, 2026 Fees Bylaw).

Sources

  1. Town of Strathmore, 2026 Fees Bylaw No. 25-23 media-003-ca.cdn.govstack.com
  2. Town of Strathmore, planning applications and fees strathmore.ca
  3. Town of Strathmore, Land Use Bylaw 14-11 media-003-ca.cdn.govstack.com
  4. Town of Strathmore, residential applications strathmore.ca
  5. Town of Strathmore, safety code permits and inspections strathmore.ca
  6. Town of Strathmore, planning and development fees strathmore.ca
  7. Calgary's 2026 schedule calgary.ca
  8. July 2026 monthly building report media-003-ca.cdn.govstack.com
  9. Planning Applications Dashboard strathmore.ca
Said Halat

Written by

Said Halat

Said runs 1to1 Plans Calgary, the studio at Unit 105, 2750 22 St NE where people walk their floor plans at full size. He's a licensed electrician and has worked in construction since 2011.

About Said and the studio
The complete studio with real furniture and a full-scale house elevation

Unit 105 · 2750 22 St NE

Come walk your plans

Every day, 9 am to 5 pm, by appointment. In the South Airways business park in northeast Calgary, with parking at the door.

Email
calgary@1to1plans.com