Commercial layouts · For business owners

Salon floor plan in Alberta: reprocessing, sinks and washrooms

An Alberta salon floor plan keeps tool reprocessing where clients can't go and out of any toilet room, and counts 4.60 m² per person. The rules, October 2026.

Owner, 1to1 Plans Calgary

Updated · 10 min read

A salon floor plan in Alberta is shaped first by the Personal Services Regulation, which Alberta Health Services (AHS) enforces. As of October 2026, if your reusable tools puncture skin or touch mucous membrane or broken skin, the sink and work surfaces where you clean them must sit in an area clients can't enter, and never in a room with a toilet (Personal Services Regulation, AR 1/2020, s.6). The Regulation and its Standards set no minimum station size and no number of sinks per chair.

Key takeaways

  • Where reusable tools puncture the body or touch mucous membrane or non-intact skin, the reprocessing sink and work surfaces must be in an area with restricted client access and not in a room with a toilet (Personal Services Regulation, s.6).
  • Reprocessing areas must be kept apart from routine employee and client traffic, dining, food preparation, sleeping and the storage of staff belongings (Personal Services Standards, 2020, 5.10).
  • AHS asks you to send plans to a public health inspector before construction, showing client service areas, storage, washrooms, reprocessing areas, finishes, lighting and ventilation (AHS checklist).
  • The building code counts a personal services shop at 4.60 m² (50 sq ft) per person, so a 92 m² (990 sq ft) salon counts as 20 people and needs one water closet for each sex (NBC(AE) 2023, 3.1.17.1 and 3.7.2.2).
  • Staff can't wash hands in a reprocessing sink without a written procedure to disinfect it in between (Personal Services Standards, 2.8).

Which Alberta rules apply to a salon, barber, spa or tattoo studio?

The Personal Services Regulation covers any business that works on a person's skin, hair, nails or teeth mainly to change how they look. Its list runs from cutting, shaving and styling to puncturing, applying suction, energy-emitting equipment and cosmetic injections (AR 1/2020, s.1). That takes in salons, barbers, nail, esthetics, spa, tattoo and piercing studios. The Regulation doesn't apply to a health service under the Health Professions Act or to premises where a dentist practises (s.2).

The Personal Services Standards, in force since 1 July 2020, form part of the Regulation (s.3) (Personal Services Standards). Public health inspectors from AHS enforce them, and you must notify AHS of your services before you offer them (AHS checklist; Standards 1.4).

The facility rules that reach the floor plan, as of October 2026:

RuleWhat it means for the planSource
Hot and cold running water from a potable sourcePlumbing to every sink you rely onRegulation 5(1)(c), (d)
A washroom with toilets and handwashing, on site or accessible to staff and clientsA washroom inside the unit or shared in the buildingRegulation 5(1)(h)
Adequate storage for equipment and suppliesStorage drawn on the planRegulation 5(1)(i)
Smooth, non-porous, easily cleanable work surfaces where services or reprocessing happenFinishes at stations, treatment rooms and the reprocessing counterRegulation 5(2)
Client service and reprocessing areas protected from contaminationLayout and partitionsRegulation s.8
Lighting good enough to clean, reprocess, inspect tools and check a client's skinTask lighting at stations and the reprocessing counterStandards 5.7
Ventilation that removes harmful vapours and airborne hazardsExhaust matched to the products and equipment you useStandards 5.8

Note: A summary of the Regulation (current to 18 December 2025) and the Standards, not a design, and AHS has the final word on how they apply.

Where does the reprocessing area go?

Reprocessing means cleaning, disinfecting or sterilizing a tool for reuse (s.1), and the floor it takes depends on what the tool touches. The Standards sort every reusable tool into three classes, and the class sets the treatment (3.8):

ClassWhat the tool touchesMinimum treatmentWhat it means for the plan
Non-criticalHair or intact skin onlyCleaning and a low-level disinfectant (3.25)Section 6 doesn't apply, but the area still stays apart from client traffic (5.10)
Semi-criticalMucous membrane or non-intact skin, without puncturingCleaning and a high-level disinfectant, fully immersed (3.26, 3.33)Section 6 applies: a restricted area, a plumbed sink, separate dirty and clean surfaces
CriticalPunctures skin or enters sterile tissueSterile at the point of use, in a steam sterilizer (3.39, 3.44)Section 6 applies, plus counter space for the sterilizer

Note: The Standards' classes as of October 2026. Single-use needles, lancets and filaments are thrown out after one client into puncture-resistant containers kept in the client service area (3.2 to 3.4).

For semi-critical and critical tools, section 6 asks for three things, on site or in a facility the tools can readily be carried to: a work surface big enough for contaminated tools, a sink connected to a permanent potable supply with hot and cold water, and a separate work surface for cleaned tools. That sink and those surfaces must be somewhere clients can't go, and not in a room with a toilet (s.6(3)). A mobile sink can't serve them (s.7). Tools with joints, crevices or hollow parts also need an ultrasonic cleaner, unless the maker says otherwise (3.19), so leave counter space for one.

AHS's checklist adds that the reprocessing area should be laid out so equipment flows one way, from dirty to clean (AHS checklist). Laid out in order:

One-way reprocessing in a personal services studioUsed tools leave the station without soiling surfaces (3.12), then Dirty work surface (s.6(2)(a)), then Plumbed sink: take apart, clean and rinse (3.15), then Dry and inspect (3.15, 3.16), then Disinfect or sterilize (3.26, 3.39), then Clean work surface, then protected storage (s.6(2)(c), 3.68). Clients can't enter this area, and it can't be in a room with a toilet (s.6(3)).Used tools leavethe stationwithout soilingDirty work surface(s.6(2)(a))Plumbed sink: takeapart, clean andrinse (3.15)Dry and inspect(3.15, 3.16)Disinfect orsterilize (3.26,3.39)Clean worksurface, thenprotected storageClients can't enter this area, and it can't be in a room with a toilet (s.6(3)).
One-way reprocessing in a personal services studio The order the Standards set for semi-critical and critical tools, from the station to protected storage.

Standard 5.10 keeps reprocessing away from "routine employee and client traffic", the staff lunch table and the coat hooks. That keeps it off the route between the front door and the washroom, and out of a back room that doubles as the break room. Soiled linen also stays apart from clean linen (3.71), so give each its own place on the plan.

Do you need a handwashing sink at every station?

No Alberta rule sets a number of handwashing sinks per station or a distance to one. As of October 2026, the Standards require hand hygiene before and after every service, around gloves and after reprocessing (2.5). Alcohol-based hand rub is allowed only on visibly clean hands (2.6).

What they fix is which sink you use. Handwashing can't happen in a reprocessing sink unless staff follow a written procedure to clean and disinfect it in between (2.8). Any handwashing sink needs soap, warm running water and a sanitary way to dry hands (2.11). Shampoo bowls don't appear anywhere in the Regulation or the Standards, so how you count them is a question for your inspector at plan review.

How many washrooms does a salon need?

The building code counts washrooms from the occupant load, and it lists barber and hairdressing shops and beauty parlours as Group D, business and personal services (NBC(AE) 2023, Note A-3.1.2.1.(1)). Table 3.1.17.1 counts personal services shops at 4.60 m² (50 sq ft) per person, half the 9.30 m² (100 sq ft) it gives offices. On the same 100 m² (1,076 sq ft) floor, that's about 22 people in a salon and 11 in an office.

One person's share of a 100 m² floorA room 10 000 mm (32 ft 10 in) by 10 000 mm (32 ft 10 in) with 4.60 2 145 mm by 2 145 mm, 9.30 3 050 mm by 3 050 mm.4.609.3010 000 mm (32 ft 10 in)10 000 mm
One person's share of a 100 m² floor Each patch is the area the code counts per person: 4.60 m² in a personal services shop (about 2 145 mm square) and 9.30 m² in an office (about 3 050 mm square). Drawn to scale.

The load splits evenly between the sexes unless you show otherwise, and up to 10 people can share one water closet (NBC(AE) 2023, 3.7.2.2). Worked through Table 3.7.2.2.-B:

Salon floor areaOccupant load at 4.60 m²Water closets
46 m² (495 sq ft) or less10 or fewer1, shared by both sexes
92 m² (990 sq ft)201 for each sex
230 m² (2,476 sq ft)501 for each sex
276 m² (2,971 sq ft)602 for each sex

Note: Code minimums as of October 2026, at the table rate. A lower designed load needs a posted sign (3.1.17.1.(2)).

On a storey that needs a barrier-free path, one washroom must be a universal washroom with a 1 700 mm (5 ft 7 in) turning space (NBC(AE) 2023, 3.8.2.8 and 3.8.3.13). The barrier-free bathroom guide covers the details. A spa that offers showers to clients needs at least one universal dressing and shower room (3.8.2.8.(13)).

What about exits, doors and the front desk?

A small salon usually needs one door out. In a floor area that isn't sprinklered, a Group D room or suite needs a second egress doorway once it passes 200 m² (2,153 sq ft) or 25 m (82 ft) of travel to the door. In a sprinklered floor area the limits are 300 m² (3,229 sq ft) and the same 25 m (NBC(AE) 2023, 3.3.1.5). More than 60 people also triggers a second door, which at 4.60 m² per person arrives above 276 m².

The barrier-free path is at least 1 000 mm (3 ft 3 in) clear, with doorways of at least 850 mm (2 ft 9 in) (3.8.3.2 and 3.8.3.6), so keep chairs and trolleys out of it. A reception counter needs one section no higher than 865 mm (2 ft 10 in) (3.8.3.20). The office layout guide covers exits and corridors in more depth.

What approvals does a Calgary salon need?

A salon fit-out in Calgary usually needs a building permit. As of October 2026, the City lists AHS review among the triggers, alongside work on any wall and a change in code classification or occupant load (The City of Calgary, 2026).

ApprovalWhen it appliesSource
Building permitWall changes, a new code classification or occupant load, a first tenant in a new building, or AHS reviewThe City of Calgary, 2026
Trade permitsPulled by each trade contractor for electrical, plumbing, gas and HVACsame
Development permit for a change of use$190 and 5 business days if permitted; $624 and 10 to 12 weeks if discretionary or relaxedsame
AHS notification and plan reviewNotify before offering services; send plans before constructionAHS checklist
City business licenceHair, esthetics, waxing, tanning, piercing, tattooing, massage, saunas and steam bathsBeauty and body services
Police clearanceTattooing, microblading, permanent makeup and piercingsame

Note: The City's and AHS's published requirements as of October 2026, not legal advice. The City's licence page also lists an AHS inspection and, for most commercial premises, a fire inspection.

What did Calgary salon and spa fit-outs declare in 2025?

Here's what the personal service permit classes declared in 2025:

Salon, barber, spa and massage fit-outs, City of Calgary permits issued in 2025
Permit typePermitsMedian declared value
Personal service, miscellaneous89$57,500
Barber shop15$40,000
Beauty shop12$72,000
Massage12$100,000

Source: City of Calgary building permits open data, permits issued in 2025 excluding cancelled ones, retrieved 2026-09-25. The median is of the construction value declared on the permit application. It isn't a quote and usually runs below what the work really costs. New homes and commercial work pay permit fees on this value; most home alterations pay a flat fee.

Class names miss some salons. In 2025, 35 non-residential improvement permits named a salon, barber, nail, wax, spa or massage business in their description, spread across seven classes, including retail shop and medical (The City of Calgary, open data). The 33 with a declared value had a median of $75,000, the applicant's own figure, which sets the permit fee and usually runs below the real cost.

Walk the client route and the dirty-tool route at full size

At the studio, your plan is lit at full size on a walkable LED floor with room names and dimension lines. Walk a client from the door to a chair, to the shampoo bowl and to the washroom. Then carry an imaginary tray of used tools from a station to the reprocessing counter and on to clean storage, and check the two routes never share a doorway.

Freestanding walls and chairs stand in for partitions and stations, changes go onto the floor on the spot, and you keep the session recording. Send plans as a PDF or DWG at least three days ahead. Commercial sessions are quoted by the size of the space, and the quote is free (pricing). Book a session, see how architects and designers use the studio, or read the other commercial layout guides, such as the medical clinic and dental office pages for their own reprocessing rules.

Questions

Does a salon in Alberta need a separate handwashing sink?

Alberta's Personal Services Standards don't set a number of handwashing sinks for a salon, as of October 2026. They do bar handwashing in a sink used for reprocessing unless staff follow a written procedure to clean and disinfect it in between (2.8). A separate hand sink removes the need for that procedure, but no rule requires one.

Can a salon clean its tools in the washroom sink?

A salon can't clean semi-critical or critical tools in a washroom, because Alberta's Personal Services Regulation says that reprocessing sink "must not be located in a room that contains a toilet" (s.6(3)(b)). AHS's opening checklist repeats the point for the reprocessing area as a whole.

What is the minimum size of a salon station in Alberta?

Alberta sets no minimum salon station size or chair spacing, as of October 2026. Neither the Personal Services Regulation nor its Standards mention station dimensions. The building code only counts 4.60 m² (50 sq ft) per person to work out occupant load, which sizes exits and washrooms, not stations.

Does a Calgary salon need AHS approval before opening?

A Calgary salon must notify Alberta Health Services of its services before offering them, and AHS asks to review plans before construction (AHS checklist). Notification is a duty; the plan review is AHS's advice, offered to help you avoid costly changes after you build. The City of Calgary also lists an AHS inspection among the approvals for a beauty and body services licence.

Sources

  1. Personal Services Regulation, AR 1/2020, s.6 kings-printer.alberta.ca
  2. Personal Services Standards, 2020 open.alberta.ca
  3. AHS checklist albertahealthservices.ca
  4. NBC(AE) 2023, 3.1.17.1 and 3.7.2.2 nrc-publications.canada.ca
  5. The City of Calgary, 2026 calgary.ca
  6. Beauty and body services calgary.ca
  7. City of Calgary building permits open data data.calgary.ca
Said Halat

Written by

Said Halat

Said runs 1to1 Plans Calgary, the studio at Unit 105, 2750 22 St NE where people walk their floor plans at full size. He's a licensed electrician and has worked in construction since 2011.

About Said and the studio
The complete studio with real furniture and a full-scale house elevation

Unit 105 · 2750 22 St NE

Come walk your plans

Every day, 9 am to 5 pm, by appointment. In the South Airways business park in northeast Calgary, with parking at the door.

Email
calgary@1to1plans.com